|
|
| Low
Operation Time |
|
The operation of ALL CL Free Pool
Systems require less than 5 Minutes per week |
The operation of the CL
Free system comprises of performing tests each week on the water's
copper ion level and its pH. If there is a need for more Ionization,
simply push the ionization button on the control box up one level until
your weekly test shows the copper level is stable at between .5 and
.7ppm. At that time, you should not have to make any further
adjustments.
|
|